Secondary Air Injection (AIR) Manifold/Pipe Replacement - Bk 1
SECONDARY AIR INJECTION (AIR) MANIFOLD/PIPE REPLACEMENT - BANK 1REMOVAL PROCEDURE
1. Remove the secondary air injection (AIR) shut-off valve.
2. Remove the AIR manifold pipe from the exhaust manifold.
3. Remove AIR shut-off valve pipe adapters from the exhaust manifold.
INSTALLATION PROCEDURE
NOTE: Refer to Fastener Notice in Service Precautions.
1. Install AIR shut-off valve pipe adapters to the exhaust manifold.
Tighten
Tighten the fasteners to 30 N.m (22 lb ft).
2. Install the manifold pipe to adapters.
3. Install the AIR shut-off valve.