Installation
1. Install the upper intake manifold gasket.
2. Install the upper intake manifold. Use care not to pinch the injector lines between the upper and lower intake manifolds.
3. Install the upper intake manifold bolts. Note the marks made at disassembly for proper stud location.
Sequence:
4. Tighten the bolts in two steps
a. Tighten the bolts on the first pass in sequence to 5 Nm (44 inch lbs.).
b. Tighten the bolts on the final pass in sequence to 10 Nm (88 inch lbs.).
5. Install the purge solenoid and bracket.
6. Install the PCV hose at the upper intake manifold.
7. Install the fuel lines from the intake to the rear of the intake manifold.
8. Install the fuel line bracket at the rear of the lower intake manifold.
9. Install the cruise control cable, if equipped.
10. Install the throttle cable and bracket.
11. Connect all wiring harness connectors.
12. Install the air cleaner assembly and intake duct.
13. Install the engine cover.
14. Connect the battery negative cable assembly to the battery negative terminal.
- Tighten the bolt to 15 Nm (11 ft. lbs.).