Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Without Balance Shaft
Each Additional0.80.5AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
With AC, Add0.20.1A
With Auto Trans, Add0.20.1A
To Grind Valves, Add2.82.0A
One CYL
Right Bank11.28.0AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank13.69.7AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks17.812.7AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank12.69.0AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank15.010.7AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks20.214.4AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.80.0A
Crankshaft, Renew4.40.0A
Oil Pump, Renew1.30.0A
Oil Pump Screen, Clean0.20.0A
Timing Chain, Renew2.00.0A
Tune-Up0.60.0A