Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.60.0A
Crankshaft, Renew5.00.0A
Oil Pump, Renew0.80.0A
Timing Chain or Gears, Renew1.30.0A
Tune-Up0.80.0A
Note
To Grind Valves, Add
One CYL
One Bank0.50.3
Both Banks1.10.8
To Replace Main Bearings, Add1.41.0
One CYL
Right Bank10.97.8AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
Left Bank10.97.8AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
Both Banks13.79.8AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
Each Additional0.80.5AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
All Cyls
Right Bank13.09.3AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
Left Bank13.09.3AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
Both Banks17.912.8AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.