Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Right Bank13.30.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Left Bank13.30.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Both Banks19.30.0AIncludes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings.
Note
With A.I.R. Pump, Add0.80.0A
With AC, Add0.40.0A