Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Add Following Operations If Performed With Piston & Ring Jobs | ||||
| Crankshaft, Renew | 0.2 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Tune-Up | 0.7 | 0.0 | A | |
| Right Bank | 13.7 | 0.0 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
| Note | ||||
| With AC, Add | 0.8 | 0.0 | A | |
| With PS, Add | 0.8 | 0.0 | A | |
| With Turbo, Add | 1.7 | 0.0 | A | |
| With A.I.R. Pump, Add | 0.4 | 0.0 | A | |
| Left Bank | 12.6 | 0.0 | A | |
| Note | ||||
| With AC, Add | 0.8 | 0.0 | A | |
| With PS, Add | 0.8 | 0.0 | A | |
| With Turbo, Add | 1.7 | 0.0 | A | |
| With A.I.R. Pump, Add | 0.4 | 0.0 | A | |
| Both Banks | 18.6 | 0.0 | A | |
| Note | ||||
| With AC, Add | 0.8 | 0.0 | A | |
| With PS, Add | 0.8 | 0.0 | A | |
| With Turbo, Add | 1.7 | 0.0 | A | |
| With A.I.R. Pump, Add | 0.4 | 0.0 | A |