Rocker Arm Assembly: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Right Bank | 1.4 | 1.1 | B | Includes: R&R Valve Cover. |
| Left Bank | 1.4 | 1.0 | B | Includes: R&R Valve Cover. |
| Both Banks | 3.4 | 1.8 | B | Includes: R&R Valve Cover. |
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Right Bank | 1.4 | 1.1 | B | Includes: R&R Valve Cover. |
| Left Bank | 1.4 | 1.0 | B | Includes: R&R Valve Cover. |
| Both Banks | 3.4 | 1.8 | B | Includes: R&R Valve Cover. |