| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Resurface/Grind |
| Right Bank | 7.8 | 5.4 | B | Includes: R&I Cylinder Heads, Reface All Valves & Grind Seats. |
| Left Bank | 6.6 | 4.5 | B | Includes: R&I Cylinder Heads, Reface All Valves & Grind Seats. |
| Both Banks | 11.1 | 7.7 | B | Includes: R&I Cylinder Heads, Reface All Valves & Grind Seats. |
| Note |
| To Ream Valve Guides, Add |
| Each | 0.1 | 0.0 | B | |
| To Replace Valve Guides, Add |
| Each | 0.2 | 0.0 | B | |
| To Overhaul Rocker Arm Shaft, Add |
| Each Shaft | 0.6 | 0.0 | B | |
| To Renew Timing Gears or Chain, Add | 1.5 | 0.0 | B | |
| To Renew Lifters, Add | 1.3 | 0.0 | B | |
| To Renew Camshaft, Add | 4.0 | 0.0 | B | |