| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| One CYL |
| Right Bank | 9.6 | 6.9 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
| Left Bank | 6.7 | 0.0 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
| Both Banks | 13.7 | 9.5 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
| Note |
| To Grind Valves, Add | 3.8 | 2.7 | A | |
| All Cyls |
| Both Banks | 16.7 | 11.6 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
| Right Bank | 11.8 | 8.1 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
| Left Bank | 10.8 | 8.0 | A | Includes: R&R Cylinder Heads, Oil Pan & Plastigage Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Crankshaft, Renew | 4.8 | 0.0 | A | |
| Main Bearings, Renew | 1.6 | 0.0 | A | |
| Oil Pump, Renew | 1.0 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Rear Main Oil Seal, Renew | 1.1 | 0.0 | A | |
| Timing Chain, Renew | 1.4 | 0.0 | A | |
| Tune-Up | 0.8 | 0.0 | A | |