| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 0.6 | 0.0 | B | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Crankshaft, Renew | 3.7 | 0.0 | B | Includes: R&R Engine |
| Oil Pump, Renew | 1.2 | 0.0 | B | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Timing Chain, Renew | 1.2 | 0.0 | B | Includes: R&R Engine |
| Tune-Up | 0.6 | 0.0 | B | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| One Cylinder |
| Right Bank | 7.7 | 5.7 | B | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Left Bank | 7.7 | 5.7 | B | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Both Banks | 9.7 | 6.7 | B | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Note |
| With AC, Add | 0.8 | 0.5 | |