| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 1.3 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs |
| Crankshaft, Renew | 4.8 | 0.0 | A | Does Not Include: R&R Engine |
| Oil Pump, Renew | 1.0 | 0.0 | A | Does Not Include: R&R Engine |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | Does Not Include: R&R Engine |
| Rear Main Oil Seal, Renew | 1.0 | 0.0 | A | Does Not Include: R&R Engine |
| Timing Chain, Renew | 2.0 | 0.0 | A | Does Not Include: R&R Engine |
| Tune-Up | 0.7 | 0.0 | A | See Valves, Grind Head Removed And Combinations. |
| One Cylinder |
| Right Bank | 11.0 | 8.0 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |
| Left Bank | 10.6 | 7.6 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |
| Both Banks | 13.0 | 10.5 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |
| All Cylinders |
| Right Bank | 11.4 | 8.4 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |
| Left Bank | 11.0 | 8.0 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |
| Both Banks | 19.6 | 12.6 | A | Includes: R&R Cylinder, Oil Pan And Plastigage Bearings. |