Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Add Following Operations If Performed With Piston & Ring Jobs | ||||
| Camshaft, Renew | 3.5 | 0.0 | A | |
| Main Bearings, Renew | 1.5 | 0.0 | A | |
| Oil Pump, Renew | 0.9 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Rear Main Oil Seal, Renew | 0.6 | 0.0 | A | |
| Timing Chain, Renew | 1.9 | 0.0 | A | |
| Tune-Up | 0.6 | 0.0 | A | |
| Valve Lifters, Renew | 1.4 | 0.0 | A | |
| One CYL | ||||
| Right Bank | 9.0 | 0.0 | A | |
| Left Bank | 9.5 | 0.0 | A | |
| Note | ||||
| With AC, Add | 0.8 | 0.0 | A | |
| With Cruise Control, Add | 0.4 | 0.0 | A | |
| With C.C.C., Add | 0.5 | 0.0 | A | |
| With A.I.R., Add | 0.8 | 0.0 | A | |
| All Cyls | 16.5 | 0.0 | A | |
| Note | ||||
| With AC, Add | 0.8 | 0.0 | A | |
| With A.I.R., Add | 0.8 | 0.0 | A | |
| With Cruise Control, Add | 0.4 | 0.0 | A | |
| With C.C.C., Add | 0.5 | 0.0 | A |