Installing Replacement Transmission (GA6HP26Z/6HP32Z)
24 00 043 Installing Replacement Transmission (GA6HP26Z/6HP32Z)Drain automatic transmission fluid at oil drain plug.
6AZ Oil drain plug
All M10 16 Nm
A5S 325Z 35 Nm
A5S 440Z M16x1.5 30 Nm
A5S 560Z 50 Nm
A5S 360R /A4S 360R M14 18 Nm
A4S 270R /A4S 31 0R 25 Nm
A5S 300J 35 Nm
GA6HP26Z/GA6HP19Z 8 Nm
Recycling:
Catch and dispose of escaping transmission fluid.
Observe country-specific waste-disposal regulations.
Important:
- Before installing replacement transmission, always flush transmission fluid cooler together with lines.
- After completion of work, check transmission fluid level.
Replacement transmission is supplied filled with transmission fluid.
Use only the approved transmission fluid.
Failure to comply with this instruction will result in serious damage to the transmission.
Necessary preliminary tasks:
^ Remove.automatic transmission.
E65 only.
Remove transmission support block from transmission.
Mount transmission block on replacement transmission.
E60 only:
Unfasten screws.
Remove transmission support block (1) and exhaust bracket (2).
6AZ Transmission support block to transmission E60 38 Nm
Convert transportation lock (1).
Convert all cable holders.
Convert all seal plugs.
Convert protective cap on output shaft.
Important: After removing transportation lock, secure torque converter against slipping out.
Transmission identification:
- Refer to Part Supplier
- on type plate