Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

With Generic Scan Tool



Combination Valves For Secondary Air Injection (air) System, Checking Function And For Proper Seal

Recommended special tools and equipment







- VAG1390 Hand Vacuum Pump

Test requirements:
- No leaks in vacuum lines or hose connections.
- Vacuum lines not clogged.

Test sequence







- Remove rear engine cover (arrows).







- Remove bolts for holding plate for solenoid valves (arrows).
- Lift up holding plate and disconnect vacuum hose of combination valve to be checked from Y-piece.
- Connect e.g. V.A.G 1390 hand vacuum pump to vacuum hose of combination valve to be checked.







- For vehicles with auxiliary heater, remove bolts (arrows) for exhaust pipe of parking heater/auxiliary heater on noise insulation.







- Loosen mounting parts -1- to -4- and remove noise insulation.







- Disconnect pressure hose -1- at Secondary Air Injection (AIR) pump motor and blow air in with light pressure (do not use pressurized air).
- Both combination valves must be closed, it must not be possible to blow through hose.
- Operate hand vacuum pump.
- The respective combination valve must open, it must be possible to blow through

If the respective combination valve does not open:
- Replace combination valve.

Final procedures
After repair work, the following work steps must be performed in the mentioned sequence:
1 - Check DTC memory, Diagnostic mode 3 - Check DTC memory. Diagnostic Mode 3: Check DTC Memory
2 - Erase DTC memory, diagnostic mode 4 - Reset/erase diagnostic data. Diagnostic Mode 4: Reset/Erase Diagnostic Data
3 - Generate readiness code. Readiness Code, Generating

- End diagnosis and switch ignition off.